Our installation and technical staff are leaders in their respective fields and strive to ensure quality work is delivered on time and on budget. Every project, no matter how big or small is assigned a dedicated project manager to ensure the successful delivery of the outcomes expected by you, the customer.
With a variety of technical specialists and engineering resources within our team, AVE Technologies truly are a one-stop shop for the delivery of any project, no matter how complex it is.
Since 1947, Singleton United Rugby League Football Club, known as the Greyhounds, has been a pillar of the community, committed to being the club of choice for Singleton and its surrounding areas. With a mission to provide exceptional facilities and resources that empower every player—junior and senior alike—to reach their full potential, the Greyhounds are dedicated to creating sustainable pathways and embracing the evolving dynamics of the sport. At AVE Technologies, we’re proud to support this vision by completing the design, supply, and installation of a state-of-the-art outdoor LED display.
The Catherine McAuley Catholic College in Medowie is one of the newest secondary schools in the Hunter region. To assist this cutting-edge learning pathway, Catherine McAuley school engaged us with installing various audiovisual systems across the college campus. These systems consist of digital signage displays, audio and video distribution systems, conferencing systems, and professional PA equipment that provide students with a deeply engaging learning environment.
AVE Technologies successfully bid to install 700 meters of ADSS fibre over 7 x 66KV overhead power lines in a Copper mine in Central NSW.
The scope of the work was to provide reliable comms from the Copper mine’s current core network cabinet onsite to a new vent fan shaft located at the end of a 66KV direct-fed fan.